RIG #3- 24 Hour Drilling Rig

Home » RIG #3- 24 Hour Drilling Rig
24-HOUR DOUBLE
Rig & Drawworks: Wilson Model 75, Single Drum, 7 Axle, Drive-In Unit, SN# 10820
Engines: 2 - 3408 Caterpillar Rig Motors (900 HP) with Twin Disc Torque Converters
Derrick:116' / 369,000 Telescoping Derrick Note: With 1-1/8 inch drill line the maximum hook load is 320,000 on 8 lines
Brakes: 42" x 8" Forged Steel with a Water Cooling System
Auxiliary Breaks:
Mud System: 2 - 220 Barrel Tanks with Guns, Agitator, Hopper, Brandt King Cobra Linear Motion Shaker, Desander and Desilter and 6 x 8 Centrifugal Mixing Pump Powered by 75 HP Electric Motor 40 Barrel Pill Tank 1-National 10-P-130 Triplex Pump powered by (1) CAT 399 (1250 hp) 1- Gardner Denver PZ-8 Triplex Pump powered by (1) CAT 3508 (860 hp)
Generator: 2 – 450 KW Powered by Detroit Diesel Series 60 Diesel Engines
Traveling Equipment: IDECO 160 ton 4 Sheave Block
Air Slips: Cavins Type C “HD” for 2-3/8, 2-7/8 and 3-1/2
Well Control Systems: Accumulator Skid - Koomey 80, 5 Bottle, 5 Station Closing System Powered by Electric Triplex Hydraulic Pump with 2 Air Operated Hydraulic Pumps BOP- Shaffer LXT 11in. X 5,000 PSI (Hydraulically operated double blowout preventer) Annular – Hydrill GK 11in. X 5,000 PSI Choke Manifold
Substructure: 225 Ton Telescoping Structure with 18' 6" Clear Height and Work Area of 25-1/2 x 15-1/2 Tubing Racked thru Structure on Ground
Rotating Equipment: Mud King RT 175 Rotary Table 17.5” x 44” Hydraulically driven, powered by Detroit Diesel 14L 630 HP engine. 4 ¼ ” Square Kelley with 6 5/8” box 4 ½” x Hole Pin
Water System: 120 Barrel Fresh Water Tank with 2 x 3 Centrifugal Water Pump
Crew Facilities: 10 x 40 Supervisor Quarters complete with 2 Bedrooms, Bathroom, Kitchen and Office, all electric 10 x 50 Crew Quarter to Accommodate Key Employees, all electric
Lagniappe: 9 x 15 Adjustable Work Floor, if necessary 5', 3' or 1-1/2' Pony Structure available when needed. 20' Vertical Dog House 3000 Gallon Fuel Tank Pipe Racks and Catwalk